01 / Discover
Confirm intended use, occupants, accessibility needs, existing buildings, desired new homes, budget, and land control.
A sequence of decisions that reduces uncertainty before major spending.
Confirm intended use, occupants, accessibility needs, existing buildings, desired new homes, budget, and land control.
Check municipal use, environmental constraints, access, utilities, title, and total dwelling count. Decide whether to proceed, revise, or stop.
Develop the concept, compare construction systems, separate costs, and obtain preliminary lender feedback. Agree a funded design scope.
Complete professional design, applications, conditions, and financing. Authorize procurement only when dependencies and risks are addressed.
Coordinate site preparation, construction, inspections, testing, controlled draws, and change orders.
Complete occupancy authorization, commissioning, punch list, warranties, manuals, and the service plan.
There is no universal approval or installation timeline. Site investigation, hearings, utility upgrades, design revisions, lender requirements, manufacturing slots, weather, and inspections determine the schedule. A short fabrication period is not the same as the full project duration.